A LEADING SERVICES PROVIDER
Our Projects
Saigon Bason Apartment (HH5) Project is built on an area of approx. 3,558 m2 located at 82 Ton Duc Thang Street, Ben Nghe Ward, District 1, Ho Chi Minh City. Comprising 46 storeys above the ground and 03-storey basement, the project will serve about 410 apartments with the gross floor area of 55,135 m2.
Services &Investments
Taking minor investment shares, Formality application for investment and construction permit.
Located at 289 Tran Hung Dao Street, Co Giang Ward, District 1, Ho Chi Minh City, 289 Tran Hung Dao Project is built on an area of approx. 4,236 m2, with the gross floor and basement areas of approx. 75,533m2 and 20,340m2 respectively. With the height of about 160m, the project comprises 35 storeys above the ground and 05-storey basement. When completed, the project will be commercial, services and office building.
Services &Investments
Taking minor investment shares, Formality application for investment and construction permit.
Ngan Binh Complex Tower is built on an area of approx. 8,320.9 m2 located at 87 Cong Quynh Street, Nguyen Cu Trinh Ward, District 1, Ho Chi Minh City. The expected height of the project is about 228.1m with 50 storeys above the ground and 4-storey basement. With the functions of commercial, apartment and office building, the building comprises 91,530 m2 of gross apartment area, 33,284 m2 of gross commercial area and about 29,729.2 m2 of gross basement area.
Services &Investments
Taking minor investment shares, Formality application for investment and construction permit.
The Ho Tram Tourist complex covers an area of 169 ha. Construction of the project 1 (phase 1 and 2) – including the two 5 – star hotels, Vietnam’s first Las Vegas – Style casinos and the specially designed Greg Norman golf.
Services &Investments
Taking minor investment shares, application for investment license &construction permit, management service.
The Project is invested by Sao Mai –Ben Dinh Petroleum Investment Joint Stock Company (PVSB), a division of Petro Vietnam to build and operate a Petroleum Marine Logistics Base and a General Cargo Port at Sao Mai – Ben Dinh area to serve oil and gas exploration companies off the Coast of Vietnam. The development includes site preparation for about 164 hectares land which is formed in 2 stages: Infrastructures, building and landscaping, shore protection, wharf and transit area;and all mechanical systems to serve smooth operation of the base.
Services &Investments
Taking minor investment shares, conduct feasibilities studies (including basic design and general cost estimate).
This outer ring road is invested under the form of BT contract (Building – Transfer Contract) to relieve traffic from Truong Son intersection (Tan Son Nhat Airport) to Nguyen Thai Son intersection, Binh Loi Bridge and is ended at Linh Xuan intersection with total length of 13.6km.
Services &Investments
Taking minor investment shares, application for investment license &construction permit, provide construction supervision consultancy, project management services.
The objective of project is to install the water transmission pipeline D2000 (L=12 km) from the clean water pumping station of Tan Hiep Water Plant to An Suong intersection and D1800 (L=12 km) from An Suong intersection to Tay Thanh (connected to the existing transmission pipeline of SAWACO). In short – term, the installed pipelines will be used to receive and transmit clean water with capacity of 150,000 m3/day from Tan Hiep Water Plant supplied by Kenh Dong Water Plant. In long – term, they will receive and transmit more clean water with capacity of 300.000 m3/day from Saigon River Water Supply Project – Phase.
Services &Investments
Taking minor investment shares, provide construction supervision consultancy.
The length of HaNoi – Hai Phong Express Project is 105.5 km with the starting point in HaNoi and ending point in Hai Phong included 06 transporting lanes and 02 emergency stopping lanes.
Services &Investments
Taking minor investment shares, application for investment license &construction permit, provide key personel for construction supervision service.
Phu My Bridge Extension Road is the East ring road construction project from Phu My bridge to Rach Chiec bridge with the length of 8.7 km and the width of 67 m;approach roadway connects Phu My with intersection of Zone A South Saigon with the length of 1,655 m including elevated road 1,587 m long and 23.7 m wide;and the construction of Zone A South Saigon intersection.
Services &Investments
Taking minor investment shares, application for investment license &construction permit, provide construction supervision service.Tham gia góp vốn đầu tư, xin giấy phép đầu tư &giấy phép xây dựng, cung cấp dịch vụ giám sát thi công.
Lach Huyen port is the first piloting PPP project between the Governments of Vietnam and Japan. It aims to respond to the growth of demand in cargo volume as well as the increase of larger vessels in the maritime transportation market by building a new international deep – sea port and related basic infrastructure in Lach Huyen area.
Services &Investments
Taking minor investment shares, provide key personnel for construction supervison service.
DELONG OPPORTUNITY INVESTMENTS PTE. LTD.
Monday - Friday: 8 A.M - 5 P.M / Saturday: 8 A.M - 12 P.M
114 Lavender Street #09-51, CT Hub 2 Singapore, 338729
Tel: +65 137875 / +84 28 22536420
Email: minh.hoang@mii-hk.com / honglinh@mii-hk.com